How Much Does a Tiler Charge Per Day in the UK?

Posted on Date Posted by Dipak Patel on 27th Aug 2025

How Much Does a Tiler Charge Per Day in the UK?

How Much Does a Tiler Charge Per Day in the UK?

Estimated reading time: 2 minutes · ✍️ By Dipak Patel

Quick Answer

Across the UK, most tilers charge £150–£250 per day (labour only), with £250–£300+ common in London and high‑demand areas. These figures exclude materials such as tiles, adhesive, grout, trims and levelling systems.

How Tilers Quote

  • Day rate: Flexible for unknowns or complex spaces.
  • Per m²: ~£25–£40 (ceramic), £40–£60 (porcelain/large‑format), £50–£70+ (natural stone or intricate patterns).
  • Fixed price: After a site visit for clearly scoped jobs (e.g., splashbacks, small bathrooms).

What Drives Price Up/Down

  • Tile type & size: Large‑format porcelain and natural stone take longer to cut and handle.
  • Layout complexity: Herringbone, mitred edges, patterns at 45°.
  • Substrate prep: Levelling, priming, removing old tiles or repairing boards.
  • Adhesive choice: Rapid‑set can speed the schedule; standard‑set offers longer work time.
  • Location & logistics: Parking, travel, access, stairs.

Example Costing

For a 12m² kitchen using 600×600 porcelain:

  • Labour (per m² @ £45): ~£540
  • Materials (guide): adhesive, grout, trims, levelling: ~£150–£250 (spec‑dependent)
  • Total (excl. tiles): ~£690–£790 + tile cost

Buy materials direct to keep spend down: adhesives, grouts, tile trims and levelling systems with next‑day delivery and free cut samples.

DIY vs Hiring a Pro

  • Hiring a pro: Faster and consistent finish—ideal for complex patterns or natural stone.
  • DIY: Big labour savings. Use a levelling system, correct trowel, and plan layouts carefully.

Quote Tips

  • Get 3+ written quotes and confirm they are labour‑only unless materials are specified.
  • Provide room measurements, tile size, pattern and subfloor condition to improve accuracy.
  • Agree prep (levelling/primer), trims, silicone and clean‑up in writing.

Bottom Line

Budget £150–£250 per day for labour. Source materials from Tile Warehouse to control the total cost without compromising on quality.

Written by Dipak Patel — Head of Tile Warehouse (marketing, digital, operations). Read full bio →